RICHLAND COUNTY MUNICIPAL CENTER
 

DATE COMPLETED

2017


DESCRIPTION

The Decker Center Remodel included the renovation of an existing one-story, 121,000 square foot area of the Decker Center strip mall located at 2500 Decker Boulevard in Columbia, South Carolina. The facility houses Richland County’s Central/Traffic Court facility as well as Sheriff’s Region Headquarter Sub Station and the Warrants Division operations. The existing building was composed of a steel frame structure veneered with CMU and insulated metal panels. The roof system was replaced with a modified bituminous sheet system. Finishes include, but were not limited to: VCT, terrazzo, ceramic and quarry tile, rubberized flooring, carpet, acoustical ceilings, wall coverings, paint and casework. As construction manager for the project, Brownstone was successfully able to complete the project on schedule and over $1.5 million under budget.

 
TOWN OF QUINBY MUNICIPAL COMPLEX
 

DATE COMPLETED

2017


DESCRIPTION

Brownstone Design was hired for architectural design services for two projects in Florence County. One of the projects is a renovation of an existing fire station into a new Town Hall. The existing building is a 1970’s, 2,106 square foot CMU block with brick veneer and includes two apparatus bays. The second project is a new 2,500 square foot recreation and community center that will be a metal building with a clerestory in the center. The goal of the project is to have a community center that will host senior citizens, children’s after school program, and children’s summer programs.